The thickness and size of the pad is controlled by soil composition among many other geographical considerations. Concrete is the industry standard for normal soil applications. The generator must be kept level and vibrates during operation and must be secured to a permanent structure. It is not advised and against many building codes to place a generator set on gravel. This allows for 16 hours of continuous operation at full load.

Fuel stored between back up fuel tank and generator fuel tank is 1200 gallon. Fuel consumption of generator (71 gal per hour full load).Īlways consult local, state and federal regulations when designing the generator area.Weight of generator with fuel tanks full (44,000 lbs.).

Physical size of generator (21 ½’ x 11 ½’).The following statistics were used in calculations: A Caterpillar 1000 kW generator set was used in the creation of the generator area. The generator area can be designed to be large enough to fit the fuel tank and allow for major maintenance to be completed with ease. Buried or above ground fuel and electrical services.Security fence installation for safety purposes.Fuel supply located accessible to fuel truck.Generator located with enough clearance between building and fuel supply to allow major maintenance.

It is helpful to design a basic drawing of the generator and supporting systems Some considerations to be made are: When setting up the site always use the generator manufacturer, state and federal guidelines. Permanent Enclosed Generator Site Planning Day tanks are common in diesel fuel applications. Facility generators can be fueled by natural gas or diesel fuel.